Pollution

  • • We are engaged in offering a quality GPCB Environmental Consultant (Gujarat Pollution Control Board) to our valuable clients. Our experienced team provides all the information about environmental plans to the clients.
  •  
  • Our professional team ensures the clients that the GPCB Consultancy service, provided by us is highly reliable and executed in the best manner.
  •  
  • Our Services include GPCB Permission, GPCB NOC, GPCB Certificate, CPCB License, GPCB Liasioning Services, GPCB Compliance Application

CTE -Consent to Establish / NOC -No Objection Certificate

  • • It involves making an application in a prescribed format to respective State Pollution Control Board along with required documents and scrutiny fees.
  •  
  • • It is followed by physical inspection of the site and assessment of the environmental management system proposed so as to meet with the mandatory requirement prescribed by State pollution Control Board.

CC&A – Consolidated Consent And Authorization / CTO – Consent to Operate

  • • Before starting / operating the activity. After getting NOC from the Board, the unit can start work related to start up the activity.
  •  
  • • And before operating the activity, the permission in the form of Consolidated Consent & Authorization [CCA] [Consent to Operate] has to be obtained, under Water Act-1974, Air Act-1981 and Environment Protection Act, 1986 and its amendment.

EC – Environmental Clearance

  • • TOR application (Form-1 & Prefeasibilty report) to be submitted/uploaded on MoEFCC portal (Parivesh)
  • • Receipt of acknowledgement regarding above stated application from MoEFCC portal
  • • Scrutiny & essential details sought by Ministry / SEIAA/SEAC
  • • Receipt of acceptance by Ministry/ SEIAA/SEAC for TOR process
  • • Submission of hardcopy of application to Ministry/ SEIAA/SEAC
  • • Invitation for presentation regarding the project to Ministry / SEAC
  • • Additional details sought by Ministry / SEIAA/SEAC
  • • TOR issuing by Ministry /SEIAA/SEAC for EIA/ EMP studies
  • • EIA/EMP studies and draft report preparation as per the TOR
  • • Draft EIA/EMP report and executive summary submission to GPCB for Public Consultation (if applicable)
  • • Public Consultation/ Hearing (if applicable) to be conducted by SPCB/ GPCB